Planning to replace your flat roof? You’re probably wondering how long you’ll have builders on site. Here’s the realistic timeline.
The Quick Answer
- Small to medium roof: 1-2 days
- Large or complicated roof: Several days to a few weeks
It depends on your roof’s size, how complex the job is, what materials you’re using, and the weather.
What Actually Happens
Step 1: Stripping the Old Roof Everything comes off—the old covering, insulation, and any damaged boards underneath.
Step 2: Checking the Structure With the old material gone, the roofer inspects the structure thoroughly. Any rot or damage gets repaired now.
Step 3: New Base Layer Fresh insulation and decking go down. This creates a solid, stable base for the new roof.
Step 4: New Roof Material Your chosen material (EPDM rubber, felt, fibreglass, or whatever you’ve picked) gets applied in layers to create a watertight seal.
Step 5: Finishing Up Flashing, gutters, and any extras like skylights get installed. Final checks happen and the site gets cleaned.
Keeping It Safe and Tidy
A good roofing contractor keeps the site safe and clean throughout. They’ll minimize disruption to your home or business as much as possible.
Choose Wisely
Pick an experienced, reputable roofer to make sure the work’s done properly and efficiently. Rushing it or cutting corners costs you more in the long run.